Primary substation and feeder reinforcement

Substation design and network reinforcement for an industrial area approaching its firm capacity limit.

Sector
Power distribution
Location
Regional
Year
2024
Scope
Studies, design and tender support

The engagement

01

The problem

Load growth had eroded the reserve on an ageing distribution network. Any single incomer outage would have taken production offline across several industrial tenants.

02

Our approach

A full load-flow and fault study established the true constraint, which proved to be protection discrimination rather than raw capacity. The design combined a new primary substation with reconfigured feeders and a corrected coordination scheme.

03

The outcome

Firm capacity restored with documented selectivity across the network, and maintenance now possible without an operational shutdown.

Next project

Coastal corridor alignment and drainage study

Transport infrastructure — 2023